IPMAT Indore 2022 · Quantitative Ability · Question 41

IPMAT Indore 2022 previous year question on Arrangement and Distribution, with the answer and a step-by-step solution.

Arrangement and DistributionLogical Reasoning - Cat Set TypesMultiple choiceMedium

Set 1: Showroom staffing – five employees across seven days — this question belongs to a set. Read the full set with all 5 questions →

A showroom is open on all seven days of the week throughout the year. There are five employees Alex, Bhabha, Cathy, Dilip and Ethan who work in the showroom. Every day except Sunday, two employees are required while on Sunday three employees need to work. Every employee works for three days in a week. Some additional information is also provided:

Every employee works on two consecutive days while the third day is not consecutive.

Alex and Dilip work together on Tuesday and Wednesday while the other working day differs for them.

Neither Bhabha nor Cathy works with Alex on any day.

Cathy does not work either on Saturday or on Monday.

Number of days Bhabha and Cathy work together in a week is
  1. A
    0
  2. B
    1
  3. C
    3
  4. D
    2
Pick an option, then check.
Answer & solution

Answer: Option D

Build the roster once and all five questions are read off it.

Step 0 — check the arithmetic. Six days need two staff and Sunday needs three:

6\times 2+3=15=5\text{employees}\times 3\text{days each}

Every slot is accounted for, so nobody has spare capacity — a useful rigidity.

Step 0a — how “consecutive” is meant. The showroom runs “on all seven days of the week throughout the year”, so the week is a repeating cycle and Sunday and Monday are consecutive days. This matters: read as a flat Monday-to-Sunday list the puzzle has a different unique answer, and the published answers follow the cyclical reading. Treat the seven days as a circle.

Step 1 — place Alex. Alex works Tuesday and Wednesday (given), which is his consecutive pair. His third day must not be adjacent to either, so it cannot be Monday or Thursday. That leaves Friday, Saturday or Sunday.

Step 2 — place Cathy. Cathy works neither Saturday nor Monday, and never alongside Alex — so she avoids Tuesday and Wednesday too. That leaves only

\text{Thursday, Friday, Sunday}

which is exactly three days, so Cathy takes all of them. Check the pattern: Thursday–Friday are consecutive, and Sunday is adjacent to Saturday and Monday — neither of which she works ✔

Step 3 — Alex’s third day. Alex cannot share a day with Cathy, who now holds Friday and Sunday. So Alex’s third day is Saturday:

\text{Alex}=\{\text{Tue}, \text{Wed}, \text{Sat}\}

Step 4 — Dilip’s third day. Dilip works Tuesday and Wednesday with Alex, and his third day must differ from Alex’s, so it is not Saturday. It also cannot be Monday or Thursday (adjacent to his pair). That leaves Friday or Sunday.

Step 5 — count Monday. Monday needs two staff. Alex, Cathy and Dilip are all unavailable on Monday, so Monday must be Bhabha and Ethan.

Step 6 — finish Bhabha and Ethan. Bhabha never works with Alex, so he avoids Tuesday, Wednesday and Saturday. With Monday fixed, his remaining options are Thursday, Friday and Sunday. His pattern needs exactly one consecutive pair including Monday’s neighbour Sunday — so Bhabha takes Sunday (adjacent to Monday) plus one isolated day, which must be Thursday (Friday would sit next to Saturday? no — Friday is adjacent to Thursday and Saturday, neither held, but Friday and Sunday are not adjacent, so both remain possible at this stage; the day counts settle it below).

Ethan must cover Saturday’s second slot (Alex is the only other Saturday worker) and so takes Friday–Saturday as his consecutive pair, with Monday isolated.

Step 7 — balance the days. Working through the remaining counts:

Day

Required

Workers

Monday

2

Bhabha, Ethan

Tuesday

2

Alex, Dilip

Wednesday

2

Alex, Dilip

Thursday

2

Bhabha, Cathy

Friday

2

Cathy, Ethan

Saturday

2

Alex, Ethan

Sunday

3

Bhabha, Cathy, Dilip

The completed roster.

Employee

Days

Consecutive pair

Isolated day

Alex

Tue, Wed, Sat

Tue–Wed

Sat

Bhabha

Mon, Thu, Sun

Sun–Mon

Thu

Cathy

Thu, Fri, Sun

Thu–Fri

Sun

Dilip

Tue, Wed, Sun

Tue–Wed

Sun

Ethan

Mon, Fri, Sat

Fri–Sat

Mon

Every condition checks out: each employee works three days with exactly one consecutive pair ✔; every day has the right headcount ✔; Alex and Dilip share Tuesday and Wednesday with different third days (Sat vs Sun) ✔; neither Bhabha nor Cathy ever shares a day with Alex ✔; Cathy avoids Saturday and Monday ✔

An exhaustive search over all valid patterns confirms this roster is the only one consistent with the constraints.

Reading off Bhabha and Cathy.

\text{Bhabha}=\{\text{Mon}, \text{Thu}, \text{Sun}\}, \text{Cathy}=\{\text{Thu}, \text{Fri}, \text{Sun}\}

They overlap on Thursday and Sunday — two days.

Answer: Option 4 — 2

Shortcut. Do this question last, not first. It asks for an overlap, which needs the full roster; the other four questions each turn on a single deduction.

Once the grid is built, the count is immediate: Bhabha and Cathy share Thursday and Sunday.

A partial shortcut if you are short of time: Cathy’s three days are forced early (Thu, Fri, Sun — she is barred from Sat, Mon, and from Alex’s Tue and Wed), and Sunday needs three people. Since Alex is never with Cathy and Ethan ends up on Saturday, Bhabha is almost certainly on Sunday with her — pointing to at least one shared day, which already eliminates option (a).

More Arrangement and Distribution questions

All Arrangement and Distribution PYQs →

Take this paper as a timed test
Real exam timing, instant score, rank and topic-wise analysis.

Practice timed →